February 12, 2015
Dear Resident:
The City of San Antonio’s Department of Transportation and Capital Improvements will be working to improve Bretton Ridge from Applewood to Perrin Beitel. The project will consist of the installation of concrete curb, sidewalk, and driveways along both sides of Perrin Beitel.
Contract crews are scheduled to begin construction on or around February 19, 2015 and the work is estimated to continue until May 29, 2015. We sincerely appreciate your patience and cooperation while these improvements are in progress. We will work diligently to restore the street to full
operational status as soon as possible. While improvements are underway, here is some helpful
information about the improvement project to assist you:
these following streets in your area:
Rock Croft, Garden Quarter Traffic detour barricades and signs will be provided to guide traffic through the construction
improvement area, as needed.
Existing rock/masonry mailboxes located in the proposed sidewalk alignment will be removed
from the project site and replaced with a decorative mailbox with a style name of Gibraltar and
Model #PED0000B. Other mailboxes will be replaced with a standard wooden post mailbox.
City of San Antonio Ordinance 29-11 states sidewalks shall be free on any hazards or obstructions;
rock/masonry mailboxes are considered to be obstructions to free passage.
alignment will be removed by the contractor and not replaced.
It will be the property owner’s responsibility to remove and transplant any shrubbery they wish to keep. The City or Contractor does not guarantee transplanted shrubbery & landscape will survive.
According to San Antonio Water System (SAWS) and Texas Commission on Environment Quality
(TCEQ) regulations, all properties with irrigation systems must have a working back flow prevention
system on their irrigation line. Irrigation systems that are encountered and impacted during sidewalkconstruction will be relocated and put back in service if the property has a working backflow
preventer.
For properties that do not have a working back flow prevention system, the sprinkler heads impacted will be cut and capped behind the new sidewalk.
In the event of adverse weather, environmental conditions, unforeseen equipment issues, or schedule
conflicts, improvements on your street will likely be delayed or rescheduled, as soon as conditionspermit. The construction dates provided above are tentative and may vary.
The contractor for this project is Austin Constructors, LLC. The on-site inspector will be Roy Stout (LAN, Inc.). During the hours of 8:00 AM to 4:30 PM Mr. Stout can be reached at 210-508-5825
After working hours or on weekends, please call 311
If you need special accommodations, or have any questions or concerns regarding this project; please contact Stephen Aniol, Project Engineer at:
Lockwood, Andrews & Newnam, Inc. (LAN)
10101 Reunion Place, Suite 200
San Antonio, Tx 78216Phone: (210) 499-5082